Ma’aden signs contract with Bechtel for feasibility study

Ma’aden signs contract with Bechtel for feasibility study

* The Saudi Arabian Mining Company (Ma’aden) has signed a SR30m ($8m) contract with Bechtel to conduct a feasibility study on a $3.2bn project to set up a 1.4m ton capacity alumina refinery and a 620,000 ton capacity aluminum smelter plant.

COPYRIGHT 2003 IC Publications Ltd.

COPYRIGHT 2008 Gale, Cengage Learning